Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2025 | ENGR Engineering Final | Partial Pass | partial pass on the playground area only. | |
| 04/09/2025 | ENGR Engineering Final | Passed | All shade structures are completed under this permit |