Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Yard Water Line
Permit Number - TC-COM-0724-01374
Inspection Description - COT - LCPL - Yard Water Line
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/31/2024 | COT - LCPL - Yard Water Line | Not Ready | work incomplete | |
07/31/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. | |
08/01/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. |
|
08/05/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . |
|
08/09/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. |
|
08/14/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. 8/14/24: Building 5 lines per plan and under 70PSI ok to proceed with tie-in. |
|
08/16/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. 8/14/24: Building 5 lines per plan and under 70PSI ok to proceed with tie-in. 8/16/24: Building 5 & 6 tie-ins made ok to backfill. Shading required |
|
08/28/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. 8/14/24: Building 5 lines per plan and under 70PSI ok to proceed with tie-in. 8/16/24: Building 5 & 6 tie-ins made ok to backfill. Shading required 8/28/24: building 5 laundry under air test passed ok to schedule tie-in inspection, building 7 air test passed ok to schedule tie-in inspection. |
|
08/29/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. 8/14/24: Building 5 lines per plan and under 70PSI ok to proceed with tie-in. 8/16/24: Building 5 & 6 tie-ins made ok to backfill. Shading required 8/28/24: building 5 laundry under air test passed ok to schedule tie-in inspection, building 7 air test passed ok to schedule tie-in inspection. 8/29/24: building 5 laundry tied in. Ok to backfill, building 7 tied-in. Ok to backfill, shading required |
|
09/20/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. 8/14/24: Building 5 lines per plan and under 70PSI ok to proceed with tie-in. 8/16/24: Building 5 & 6 tie-ins made ok to backfill. Shading required 8/28/24: building 5 laundry under air test passed ok to schedule tie-in inspection, building 7 air test passed ok to schedule tie-in inspection. 8/29/24: building 5 laundry tied in. Ok to backfill, building 7 tied-in. Ok to backfill, shading required 9/20/24: Building 3 lines per plan and under pressure. Ok to proceed with Tie-in. |
|
09/24/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. 8/14/24: Building 5 lines per plan and under 70PSI ok to proceed with tie-in. 8/16/24: Building 5 & 6 tie-ins made ok to backfill. Shading required 8/28/24: building 5 laundry under air test passed ok to schedule tie-in inspection, building 7 air test passed ok to schedule tie-in inspection. 8/29/24: building 5 laundry tied in. Ok to backfill, building 7 tied-in. Ok to backfill, shading required 9/20/24: Building 3 lines per plan and under pressure. Ok to proceed with Tie-in. 9/24/24: Building 3 lines have been tied in ok to backfill. Shading required. |
|
10/02/2024 | COT - LCPL - Yard Water Line | Partial Pass | 7/31/24: building 9 Main water line per plan and under test at 70psi. ok to backfill. Shading required. 8/1/24: building 9 tied in ok to backfill, all joints were dry and connections were made with approved fittings. 8/5/24: building 10 main water line per plan and under pressure at 70psi. Ok to proceed . 8/9/24: building 10 main water tied in ok to backfill. Building 6 water line per plan and under 70psi ok to schedule tie-in inspection. 8/14/24: Building 5 lines per plan and under 70PSI ok to proceed with tie-in. 8/16/24: Building 5 & 6 tie-ins made ok to backfill. Shading required 8/28/24: building 5 laundry under air test passed ok to schedule tie-in inspection, building 7 air test passed ok to schedule tie-in inspection. 8/29/24: building 5 laundry tied in. Ok to backfill, building 7 tied-in. Ok to backfill, shading required 9/20/24: Building 3 lines per plan and under pressure. Ok to proceed with Tie-in. 9/24/24: Building 3 lines have been tied in ok to backfill. Shading required. 10/2/24: Building 2 lines per plan under pressure ok to proceed with Tie-in. Building 4 Partial per plans under pressure ok to proceed with tie-in at progress area. |