Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2026 | BULD - Electrical Clearance | Re-inspection required | Provide letter of torque with letter head. Ensure equipment is open at next inspection. 8/6/2026 |