Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | COT - LCEL - Electrical Final | Not Ready | Provide grab bars at ada stalls. Both women’s and men’s room. Provide printed panel schedules at all electrical panels. Label all j boxes in mechanical room and pump room. Ensure all receptacles are GFCI protected. Provide dedicated disconnect for water heater and receptacle for recirculating pump. Add supports to schedule 80 pipes at pumps in pump room. Secure seal tight behind filter. 9/24/2026 |
|
| 09/30/2026 | COT - LCEL - Electrical Final | Not Ready | ||
| 09/30/2026 | COT - LCEL - Electrical Final | Passed |