Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
Permit Number - TC-COM-0724-01365
Inspection Description - COT - LCEL - Electrical Underground
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | COT - LCEL - Electrical Underground | Partial Pass | Light pole (P4) Cristy box from (PB33) feeding P2, P3 and PBx2 1” schedule 40 at approximately 32”. Okay to backfill all progress areas. Shading required. 8/22/2025 | |
| 09/03/2025 | COT - LCEL - Electrical Underground | Partial Pass | 9-3-25: verified trench depth on 1" Schedule 40 electrical conduits for 5 light pole cages located on northwest side of park. Okay to backfill progress areas with shading materials. | |
| 09/05/2025 | COT - LCEL - Electrical Underground | Partial Pass | Conduits (1”) for light poles at basketball courts. Ok to cover progress areas. | |
| 09/22/2025 | COT - LCEL - Electrical Underground | Partial Pass | X2 schedule 40. 2” for musco lighting. 1” is for parking lot lighting. 24” depth. Running East to west. From parking lot light pole (Lp1004A1)-(ML1020A) okay to backfill all progress areas. 9/22/2025 | |
| 09/29/2025 | COT - LCEL - Electrical Underground | Partial Pass | X2 2”. 1 For lighting at MUSCO (B3) (M4016A1) - (A3) . X1 1 1/2” from switch gear running to transformer circuit #32 future. 9/29/2025 | |
| 10/03/2025 | COT - LCEL - Electrical Underground | Partial Pass | 10-3-25: verified trench depth on Schedule 40 conduits for lighting Musco (A30) (MLIOMA)heading in a Southwest direction for future light pole & ramada just passed the sidewalk. Okay to backfill approximately 240' of open trench. | |
| 10/09/2025 | COT - LCEL - Electrical Underground | Partial Pass | X1 2” x1 1 1/2” x1 1” Ml1012A under ground running south to Cristy box for disconnect at pump house. 2” From pump house to musco light B4. 1” feeding column for Ramada at station Sc1004A. Okay to backfill progress areas. Shading is required. 10/9/2025 | |
| 10/13/2025 | COT - LCEL - Electrical Underground | Canceled | ||
| 10/14/2025 | COT - LCEL - Electrical Underground | Re-inspection required | 10-14-25: reschedule inspection when trench/caisson footings contain no water. | |
| 10/15/2025 | COT - LCEL - Electrical Underground | Partial Pass | 10-15-25: excavation/reinforcement/ electrical underground on 5 light pole cages verified per plans-okay for concrete plate on station's-LP103OA1, LP1028A1,LP1026A,LP1062A2, LP1066A1. | |
| 10/16/2025 | COT - LCEL - Electrical Underground | Partial Pass | 1” schedule 40 @ 24” depth From Station LP1060A, LP1062A , LP1064A, LP1066A, LP1068A. (From 4th street hooking around towards 22nd heading East) at perimeter lighting. Okay to backfill progress areas. Shading required. 10/16/2025 | |
| 10/23/2025 | COT - LCEL - Electrical Underground | Partial Pass | Electric conduits in place (2 @ 1 1/2” - 1 @ 2”) from basketball courts to East entry: approximately 450’. Ok to back fill progress area. | |
| 10/30/2025 | COT - LCEL - Electrical Underground | Partial Pass | Partial to pour for 5 light poles LP106AI, LP1054A2, P1135AI, LP044A, LP102A28A2 | |
| 11/13/2025 | COT - LCEL - Electrical Underground | Partial Pass | Electric conduits for gear box and SES cabinet: conduits at 1” - 2 1/2” conduits. Ok to cover cabinet and box areas. | |
| 11/20/2025 | COT - LCEL - Electrical Underground | Canceled | Contractor cancelled due to weather. | |
| 11/21/2025 | COT - LCEL - Electrical Underground | Partial Pass | 11-21-25: verified 2 separate trenches with 3-Schedule 40 electrical conduits in each running from east to west in center of site. Electrical conduits range from 1 1/2" to 2" in size and are secondary conduits for parking lot lighting, scoreboard, and musco sport lighting. Okay to backfill approximately 400' of combined trenching using shading materials. | |
| 11/25/2025 | COT - LCEL - Electrical Underground | Partial Pass | Underground conduits (2” - 1”) at Light S1 to junction box Northeast; approximately 175’; trenching with conduits (2” - 1”) at Skate board area South and West; approximately 300’. Ok to cover progress areas. |