Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | COT - LCBU - Building Final | Not Ready | Ensure all special inspection reports are uploaded. Prior to finals. Ensure all conditions are satisfied. Provide grab bars at ada stalls. Both women’s and men’s room. Provide printed panel schedules at all electrical panels. Label all j boxes in mechanical room and pump room. Ensure all receptacles are GFCI protected. Provide dedicated disconnect for water heater and receptacle for recirculating pump. Add supports to schedule 80 pipes at pumps in pump room. Secure seal tight behind filter. 9/24/2026 |
|
| 09/30/2026 | COT - LCBU - Building Final | Passed |