Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2025 | BULD - Electrical Clearance | Passed | Approved 400A service panel upgrade - INCR Clearance to TEP is required for the electrical cutover of master meter unit 1 Final -NR |
|
| 12/11/2024 | BULD - Electrical Clearance | Passed | Approved 400A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending final - NR |