Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/08/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractors grouting the entryway on both sides of the door. It’s good to grout. |
| 10/09/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to remove all the construction equipment around the building and the dumpster that’s in front |
| 10/15/2024 |
ENGR Engineering Final
|
|
Passed |
CO Ready |