02/01/2024 | COT - HCPL - Rough Soil | Partial Pass | 12/11/23: Pre-con meeting wanted. 2/1/24: 4" PVC SDR35 from 2 way clean-out at building to existing clean out at north east corner of lot. Per plan ok to backfill. pending connection to 2-way cleanout at south end of building. |
|
02/15/2024 | COT - HCPL - Rough Soil | Partial Pass | 12/11/23: Pre-con meeting wanted. 2/1/24: 4" PVC SDR35 from 2 way clean-out at building to existing clean out at north east corner of lot. Per plan ok to backfill. pending connection to 2-way cleanout at south end of building. 2/15/24: Water line holding under pressure ok to backfill. Pending point of connection to building. |
|
03/14/2024 | COT - HCPL - Rough Soil | Partial Pass | 12/11/23: Pre-con meeting wanted. 2/1/24: 4" PVC SDR35 from 2 way clean-out at building to existing clean out at north east corner of lot. Per plan ok to backfill. pending connection to 2-way cleanout at south end of building. 2/15/24: Water line holding under pressure ok to backfill. Pending point of connection to building. 2/14/24: wanted DP inspection |
|
05/23/2024 | COT - HCPL - Rough Soil | Passed | ||
12/11/2023 | COT - HCPL - Rough Soil | Not Ready | 12/11/23: Pre-con meeting wanted. |