Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
Permit Number - TC-COM-0723-01638
Inspection Description - COT - HCEL - Electrical Underground
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
04/05/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
04/11/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
05/06/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
05/15/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required |
|
05/23/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. |
|
05/29/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. |
|
06/11/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W |
|
06/13/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. |
|
06/14/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. |
|
06/25/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. |
|
07/18/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. |
|
07/19/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 |
|
07/24/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. |
|
07/30/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. |
|
08/02/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. |
|
08/06/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. 8/6/24: electrical underground for panel H7 and compressor 1&2 from GL Q-S/10, (4)2" Low voltage conduit from GL Q/10-16 ok to backfill. |
|
08/08/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. 8/6/24: electrical underground for panel H7 and compressor 1&2 from GL Q-S/10, (4)2" Low voltage conduit from GL Q/10-16 ok to backfill. 8/8/24: electrical underground (2)2" for communication GL N-B/16, exhaust fan 6 and 7, security and tarmac light electrical underground per plans at Z/3. |
|
08/14/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. 8/6/24: electrical underground for panel H7 and compressor 1&2 from GL Q-S/10, (4)2" Low voltage conduit from GL Q/10-16 ok to backfill. 8/8/24: electrical underground (2)2" for communication GL N-B/16, exhaust fan 6 and 7, security and tarmac light electrical underground per plans at Z/3. 8/14/24:GL/ 15.5 (2)2" conduit for panels ok to backfill , GL 17.5 1" hanger light ok to backfill, 1" and 2" conduit for gate operator and communication at GL A/13.5-8.5 |
|
08/19/2024 | COT - HCEL - Electrical Underground | Partial Pass | 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. 8/6/24: electrical underground for panel H7 and compressor 1&2 from GL Q-S/10, (4)2" Low voltage conduit from GL Q/10-16 ok to backfill. 8/8/24: electrical underground (2)2" for communication GL N-B/16, exhaust fan 6 and 7, security and tarmac light electrical underground per plans at Z/3. 8/14/24:GL/ 15.5 (2)2" conduit for panels ok to backfill , GL 17.5 1" hanger light ok to backfill, 1" and 2" conduit for gate operator and communication at GL A/13.5-8.5 8/19/24: electric underground GL Q-Z/11 (2) 2" for panel H7 and (2) 2" for compressor 1 and 2. |
|
08/19/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. |
|
08/23/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 8/23/24: (10)4" conduit from North East corner of building to about 150' north of building ok to backfill progress area. |
|
08/30/2024 | COT - HCEL - Electrical Underground | Partial Pass | 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. 8/6/24: electrical underground for panel H7 and compressor 1&2 from GL Q-S/10, (4)2" Low voltage conduit from GL Q/10-16 ok to backfill. 8/8/24: electrical underground (2)2" for communication GL N-B/16, exhaust fan 6 and 7, security and tarmac light electrical underground per plans at Z/3. 8/14/24:GL/ 15.5 (2)2" conduit for panels ok to backfill , GL 17.5 1" hanger light ok to backfill, 1" and 2" conduit for gate operator and communication at GL A/13.5-8.5 8/19/24: electric underground GL Q-Z/11 (2) 2" for panel H7 and (2) 2" for compressor 1 and 2. 8/30/24: 70' run of (10)4" conduit for secondaries ok to backfill. (North of project) |
|
09/04/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial approval for chases through East Hanger footer Partial approval for chases through West Hanger footer Partial grid 7-9 and B-H ok to cover Partial approval, gridlines Z to Da and 3 to 9 5/15/24: elected underground- (4) 2” and (2) 2 1/2” conduit from service entrance at GL Z/7 to GL L/7 ok to backfill. Shading required 5/23/24: (10) 4" conduit from SES to transformer( 10' run out of building going southeast). (9) 4" conduit from SES to MSB ok to backfill. Main panel feeders ok to backfill. 5/29/24: (10)4" conduit from MSB running 100' to north east corner of building to transformer. Ok to backfill progress area. 6/11/24: electrical underground per plan at Gridline 3 from L-W 6/13/24: wanted temp power inspection at office trailer. Passed ok to proceed. 6/14/24: electrical underground at offices on north east of building passed ok to backfill. 6/25/24: (2) 4" and (1) 2" conduit for Telecomm from building to terminal box at north half of project site. Ok to backfill. 7/18/24: Electrical underground per plan at North west corner of hanger GL 7-8 ok to backfill progress areas. 8/23/24: (10)4" conduit from North East corner of building to about 150' north of building ok to backfill progress area. 9/4/24: Secondary's to Transformer pad passed ok to backfill. |
|
09/16/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial pass Total of 5 Light Pole Bases at North Parking area per plan, okay for concrete placement. 9/16/2024 | |
09/25/2024 | COT - HCEL - Electrical Underground | Partial Pass | 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. 8/6/24: electrical underground for panel H7 and compressor 1&2 from GL Q-S/10, (4)2" Low voltage conduit from GL Q/10-16 ok to backfill. 8/8/24: electrical underground (2)2" for communication GL N-B/16, exhaust fan 6 and 7, security and tarmac light electrical underground per plans at Z/3. 8/14/24:GL/ 15.5 (2)2" conduit for panels ok to backfill , GL 17.5 1" hanger light ok to backfill, 1" and 2" conduit for gate operator and communication at GL A/13.5-8.5 8/19/24: electric underground GL Q-Z/11 (2) 2" for panel H7 and (2) 2" for compressor 1 and 2. 8/30/24: 70' run of (10)4" conduit for secondaries ok to backfill. (North of project) 9/25/24: electrical underground passed at 7 light pole bases at south end of project site |
|
10/16/2024 | COT - HCEL - Electrical Underground | Partial Pass | 7/19/24: (1)2" and (1)2 1/2" conduit from GL V-Q/7 7/24/24: electrical underground for 5 light poles north entrance of building and 3 on south east corner of project.ok to backfill progress areas. 7/30/24: electrical underground for 3 light poles on southwest corner of job site. 8/2/24: electrical underground for all 7 light poles on south end of building complete ok to backfill progress areas. Shading required. 8/6/24: electrical underground for panel H7 and compressor 1&2 from GL Q-S/10, (4)2" Low voltage conduit from GL Q/10-16 ok to backfill. 8/8/24: electrical underground (2)2" for communication GL N-B/16, exhaust fan 6 and 7, security and tarmac light electrical underground per plans at Z/3. 8/14/24:GL/ 15.5 (2)2" conduit for panels ok to backfill , GL 17.5 1" hanger light ok to backfill, 1" and 2" conduit for gate operator and communication at GL A/13.5-8.5 8/19/24: electric underground GL Q-Z/11 (2) 2" for panel H7 and (2) 2" for compressor 1 and 2. 8/30/24: 70' run of (10)4" conduit for secondaries ok to backfill. (North of project) 9/25/24: electrical underground passed at 7 light pole bases at south end of project site 10/16/24: Partial Electrical U/G at Airside Taxi Way Lights ok to proceed with slurry. . |