Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
Permit Number - TC-COM-0723-01638
Inspection Description - COT - HCBU - Excavation/Rebar/Zoning
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/06/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
03/21/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
03/28/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
04/05/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
04/11/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 4/11/24 see attached photos | |
04/18/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
04/24/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, |
|
05/02/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. |
|
05/06/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
05/21/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. |
|
05/23/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 |
|
05/29/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. |
|
07/10/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. |
|
07/24/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. 7/24/24: loading dock stairs reinforcement per plan ok to proceed. |
|
08/02/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. 7/24/24: loading dock stairs reinforcement per plan ok to proceed. 8/2/24: CIP Column and matte slab reinforcement per plans ok to pour concrete. |
|
08/09/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. 7/24/24: loading dock stairs reinforcement per plan ok to proceed. 8/2/24: CIP Column and matte slab reinforcement per plans ok to pour concrete. 8/9/24: first pour north ok to proceed. 4 columns at entry reinforcement per plan ok to proceed. |
|
08/13/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. 7/24/24: loading dock stairs reinforcement per plan ok to proceed. 8/2/24: CIP Column and matte slab reinforcement per plans ok to pour concrete. 8/9/24: first pour north ok to proceed. 4 columns at entry reinforcement per plan ok to proceed. 8/13/24: Anchor bolts at 4 entry columns per plan ok to proceed. |
|
08/19/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. 7/24/24: loading dock stairs reinforcement per plan ok to proceed. 8/2/24: CIP Column and matte slab reinforcement per plans ok to pour concrete. 8/9/24: first pour north ok to proceed. 4 columns at entry reinforcement per plan ok to proceed. 8/13/24: Anchor bolts at 4 entry columns per plan ok to proceed. 8/19/24: 3 entry columns formed and ready to pour ok to proceed. |
|
08/20/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. 7/24/24: loading dock stairs reinforcement per plan ok to proceed. 8/2/24: CIP Column and matte slab reinforcement per plans ok to pour concrete. 8/9/24: first pour north ok to proceed. 4 columns at entry reinforcement per plan ok to proceed. 8/13/24: Anchor bolts at 4 entry columns per plan ok to proceed. 8/19/24: 3 entry columns formed and ready to pour ok to proceed. |
|
09/16/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Partial pass Total of 5 Light Pole Bases at North Parking area per plan, okay for concrete placement. 9/16/2024 | |
09/25/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 3/6/24 Partial by third party 3/21/24 stem wall line B/3-6.8, LINE 3/B-M,N.5-X.7 AND COLUMN FOOTERS LINE 7/D-X 14 PIERS 3/28/24 partial approval for East hanger footer see third-party inspection OK to place concrete. Partial approval for tool room footer grid line 3-Z to Northwest corner, OK to place concrete 4/5/24 partial approval for East hanger footer see third-party inspection OK to place concrete. 4/18/24 Zee line 7 to 20 pedestal bases OK to place concrete, grid line DA to CA5 and 3 to 12 for stemwall OK to place concrete, partial approval for manhole base poor OK to continue in progress area. 4/24/24: Z line (8,9,10,11,12) Pedestal bases ok to place concrete (1/S82), B line (8,9,10,11,12) pedestal bases ok to place concrete, Dock stem wall and Dock retaining wall per plan ok to place concrete, 5/2/24: loading docks wall footing on north side per detail S84/44 per plan ok to proceed. Shop south wall detail S82/13 and S82/7 for 3 column pedestal footings per plan. 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/ |
|
09/25/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 5/6/24 Grid 3 from m to n partial for stem wall, ok to place concrete 5/21/24: Partial Rebar at Loading dock pit and Hangar SE/ SW Door Pockets GL A/18-20 and GL Z/18-20. Pedestal reinforcements per plan ok to proceed. 5/23/24: foundation exterior wall reinforcement per plan at GL Da/12.1 - Ca/12.1, pedestals reinforcement per plan at GL Da/12.1, Ca.5/12.1, Ca.12.1 5/29/24: footing inspection at dumpster is under DP permit. 7/10/24:footing at GL A-Z/19 per detail S82/16 per plans ok to proceed, stem wall reinforcement per plan at GL Z-DA/12 per detail S82/13 and S82/7. 7/24/24: loading dock stairs reinforcement per plan ok to proceed. 8/2/24: CIP Column and matte slab reinforcement per plans ok to pour concrete. 8/9/24: first pour north ok to proceed. 4 columns at entry reinforcement per plan ok to proceed. 8/13/24: Anchor bolts at 4 entry columns per plan ok to proceed. 8/19/24: 3 entry columns formed and ready to pour ok to proceed. Partial pass Total of 5 Light Pole Bases at North Parking area per plan, okay for concrete placement. 9/16/2024 9/25/24: remaining 7 light pole bases at south of project site per plan. Ok for concrete placement. Pre slab at pour 3 GL B-Z/ 12.5 -15 |