Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
Permit Number - TC-COM-0723-01638
Inspection Description - COT - HCPL - Rough Soil
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/02/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 |
|
07/10/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. |
|
07/19/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. 7/19/24: 3/4" Copper Air line in 3" Sleeve under 150psi GL V/7-10 ok to backfill progress areas. Plumbing underground from future connection at oil/water separator from GL A-F/8.5-10. |
|
07/30/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. 7/19/24: 3/4" Copper Air line in 3" Sleeve under 150psi GL V/7-10 ok to backfill progress areas. Plumbing underground from future connection at oil/water separator from GL A-F/8.5-10. 7/30/24: Pending test at oil/water separator |
|
08/02/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. 7/19/24: 3/4" Copper Air line in 3" Sleeve under 150psi GL V/7-10 ok to backfill progress areas. Plumbing underground from future connection at oil/water separator from GL A-F/8.5-10. 7/30/24: Pending test at oil/water separator 8/2/24: Oil/water separator under test ok to backfill progress area. |
|
08/14/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. 7/19/24: 3/4" Copper Air line in 3" Sleeve under 150psi GL V/7-10 ok to backfill progress areas. Plumbing underground from future connection at oil/water separator from GL A-F/8.5-10. 7/30/24: Pending test at oil/water separator 8/2/24: Oil/water separator under test ok to backfill progress area. 8/14/24: plumbing underground from GL E/10-16 per plans ok to proceed. North trench drain GL/10 ok to proceed. |
|
08/19/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. 7/19/24: 3/4" Copper Air line in 3" Sleeve under 150psi GL V/7-10 ok to backfill progress areas. Plumbing underground from future connection at oil/water separator from GL A-F/8.5-10. 7/30/24: Pending test at oil/water separator 8/2/24: Oil/water separator under test ok to backfill progress area. 8/14/24: plumbing underground from GL E/10-16 per plans ok to proceed. North trench drain GL/10 ok to proceed. 8/19/24: 3" foot vent with cleanout for combo waste and vent GL Z-M/13 ok to backfill. Shading required. |
|
08/21/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. 7/19/24: 3/4" Copper Air line in 3" Sleeve under 150psi GL V/7-10 ok to backfill progress areas. Plumbing underground from future connection at oil/water separator from GL A-F/8.5-10. 7/30/24: Pending test at oil/water separator 8/2/24: Oil/water separator under test ok to backfill progress area. 8/14/24: plumbing underground from GL E/10-16 per plans ok to proceed. North trench drain GL/10 ok to proceed. 8/19/24: 3" foot vent with cleanout for combo waste and vent GL Z-M/13 ok to backfill. Shading required. 8/21/24: plumbing underground for floor drains from GL 19/Z-E ok to backfill ok to proceed, shading required |
|
08/27/2024 | COT - HCPL - Rough Soil | Partial Pass | 4/22/24: 60' of 6' PVC piping from Manhole #1 to cleanout#1 ok to backfill. 4/24/24: From Clean out #1 to Clean out #2 ok to backfill. 4/26/24: From clean out #3 to Clean out #4 ok to backfill. 4/30/24: Ok to backfill from cleanout #1 to cleanout #6 5/2/24: ok to backfill from cleanout #6 to cleanout#8 7/10/24: trench drains underground plumbing per plans from GL N-Q,X-Ab/3 ok to backfill progress area, Sewer 20' stub out at GL Ab.5/3 capped at future run, ok to backfill progress area, floor trench at GL Da/6.8-8 ok to backfill progress area. 7/19/24: 3/4" Copper Air line in 3" Sleeve under 150psi GL V/7-10 ok to backfill progress areas. Plumbing underground from future connection at oil/water separator from GL A-F/8.5-10. 7/30/24: Pending test at oil/water separator 8/2/24: Oil/water separator under test ok to backfill progress area. 8/14/24: plumbing underground from GL E/10-16 per plans ok to proceed. North trench drain GL/10 ok to proceed. 8/19/24: 3" foot vent with cleanout for combo waste and vent GL Z-M/13 ok to backfill. Shading required. 8/21/24: plumbing underground for floor drains from GL 19/Z-E ok to backfill ok to proceed, shading required 8/27/24: Plumbing underground at Mechanical room per plan ok to proceed with backfill. |
|
09/30/2024 | COT - HCPL - Rough Soil | Partial Pass | From grid line 7-12. Z- BA. Room S134, S150, S151, and S152. Okay to backfill progress areas. 9/30/2024 |