Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2026 |
COT - LCBU - Framing |
|
Not Ready |
wanted shear inspected. |
| 11/13/2026 |
COT - LCBU - Framing |
|
Re-inspection required |
11/13/26: add anchor bolts at marked locations, add a sister stud at north east area of exterior wall, missing H1's & H2's, add nails at exterior sheathing along edges-not all walked. Have framers rewalk sheathing and add nails per schedule. Do not over penetrate more than 1/16" and install nails no closer than 3/8" from joints/edges.See detail 16 for load bearing walls/ Shear walls add A34's & hold downs where required. Provide ladder for roof access. Stopped inspection- additional items may be noted |