Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - LCBU - Building Final | Re-inspection required | 9-4-26: air balance report required prior to finals. Submit report to the city for review and approval. Roof access required. Please arrange access with property management and reschedule inspections. | ||
| 09/08/2026 | COT - LCBU - Building Final | Partial Pass | 9-8-26: paint exterior pvc on rooftop, provide a panel schedule for PB-1, label all disconnects & install plastic bushings at conduits to disconnect boxes on rooftop. Sediment traps are required on all rooftop HVAC gas units. |
|
| COT - LCBU - Building Final | Scheduled |