Permit: TC-COM-0626-00893

Parcel: 14026040C


Addresses:

2850 E DREXEL RD

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
10/28/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Partial pass. Building continuous footing from grid line 1/B - F/8. Grid line A/2.5 - 6.5. Okay for concrete placement. 10/28/2026
10/29/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Partial pass. Building continuous footing from grid line 1 columns A-B. Grid line 1-3 on column A approved. Okay for concrete placement at. 10/29/2026
11/13/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 11/13/26: excavation/reinforcement layout at far east slab on grade, dock walls & footings verified per detail 107, 105, 102, 103. Okay for concrete placement.
Note: provide clarification on whether dowels to existing concrete at building are required. If so, submit an RFI for review & approval.
11/16/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 11/16/26: verified dry pack on 10 columns at far east slab together with #5 dowels spaced at 24" o.c. Into the north side of the existing building.