Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2026 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | Partial pass. Building continuous footing from grid line 1/B - F/8. Grid line A/2.5 - 6.5. Okay for concrete placement. 10/28/2026 | |
| 10/29/2026 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | Partial pass. Building continuous footing from grid line 1 columns A-B. Grid line 1-3 on column A approved. Okay for concrete placement at. 10/29/2026 | |
| 11/13/2026 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | 11/13/26: excavation/reinforcement layout at far east slab on grade, dock walls & footings verified per detail 107, 105, 102, 103. Okay for concrete placement. Note: provide clarification on whether dowels to existing concrete at building are required. If so, submit an RFI for review & approval. |
|
| 11/16/2026 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | 11/16/26: verified dry pack on 10 columns at far east slab together with #5 dowels spaced at 24" o.c. Into the north side of the existing building. |