Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2025 |
COT - HCBU - Building Final |
|
Re-inspection required |
8-22-25: adjust both restroom doors, main doors, and all interior doors (minus fire door 15 pounds ) to open at 5 pounds of pressure, lower tallest drinking fountain per detail-A6.09/7, paint all exterior pvc/abs, missing bathroom signs-must contain braille, missing building signage and connect front automatic entrance feature, connect all low voltage equipment. |
| 09/04/2025 |
COT - HCBU - Building Final |
|
Partial Pass |
Partial pass . Corrections were made. Pending other inspections. 9/4/2025 |
| 09/11/2025 |
COT - HCBU - Building Final |
|
Partial Pass |
9/11/25: OKAY FOR LEVEL 4 TCO |
| 10/13/2025 |
COT - HCBU - Building Final |
|
Passed |
|