Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-0624-01274
Inspection Description - ENGR Engineering Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | ENGR Engineering Final | Partial Pass | Okay for level 2 TCO | |
| 02/12/2025 | ENGR Engineering Final | Partial Pass | contractor needs to add another number four in the layout for the vertical rebar. Because they laid it out at 4 foot centers not at 32 inch centers. Contractor needs to drill and epoxy a number four bar in between each of the bars at 4 foot and at the corners, they need to have one number four on the first cell and one number four on the second cell in the front of the trash enclosure. | |
| 02/13/2025 | ENGR Engineering Final | Partial Pass | good for a T C O level four | |
| 04/07/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to clean up in the back area. Contractor also needs to address the downspouts in the back of the building. | |
| 04/14/2025 | ENGR Engineering Final | Passed |