Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Preslab
Permit Number - TC-COM-0624-01147
Inspection Description - COT - HCBU - Preslab
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2025 | COT - HCBU - Preslab | Partial Pass | Grade beam footings, total of 5. 4.1-G/H. X2 @ 2-2.9-G/H. 4.1-5G/H. 5/6-G/H. Okay for concrete placement. 6/5/2025 | |
| 06/06/2025 | COT - HCBU - Preslab | Partial Pass | Tilt up panels 1-35 approved. Panel 24 will be approved per third party report. Reinforcements and clearances per plan okay for concrete placement. 6/6/2025 | |
| 08/06/2025 | COT - HCBU - Preslab | Partial Pass | Reenforced rebar slabs at GL: 9.5 - 10.5/A - D; E.5 - A/ 8 - 9.5. OK to place concrete in progress areas. | |
| 08/13/2025 | COT - HCBU - Preslab | Partial Pass | 8-14-25: reinforcement ,vapor barrier & details for slab on grade verified per plans on Gridlines 8 to east wall AA to B. Okay for concrete placement at progress areas. | |
| 08/20/2025 | COT - HCBU - Preslab | Partial Pass | 8-20-25: reinforcement for slab on grade at Gridline 4-8/E-east verified per plans-okay for concrete placement. | |
| 08/21/2025 | COT - HCBU - Preslab | Partial Pass | 8-21-25: Reinforcement verified per on slab on grade-okay to pour concrete at Gridline E-G/3-7 | |
| 08/28/2025 | COT - HCBU - Preslab | Partial Pass | Slab area at GL: B - G/0.2 - 2.9. OK to place concrete in progress areas. Ensure slab area is termite treated.. | |
| 09/25/2025 | COT - HCBU - Preslab | Partial Pass | 9-25-25: reinforcement at Gridline 4-7/G-H & 0.1 to East/ G between G& F verified per S2.1- detail's 2& 9. Okay for concrete placement at progress areas. | |
| 10/03/2025 | COT - HCBU - Preslab | Re-inspection required | 10-3-25: not ready-arrived on site at 1300 hours and made contact with contractor. Inspection is for slab on grade but wasn't ready. Contractor may consider same day inspection. | |
| 10/06/2025 | COT - HCBU - Preslab | Partial Pass | 10-6-25: reinforcement for slab on grade verified per plans. Okay for concrete placement between Gridlines 2-2.8 to 4.1/ C-F. | |
| 10/08/2025 | COT - HCBU - Preslab | Partial Pass | Slab area Northeast corner of building , North of archery range. Ok to,place concrete in slab area. | |
| 10/23/2025 | COT - HCBU - Preslab | Partial Pass | 10-23-25: reinforcement for interior & exterior slab on grade located at the boat service verified per plans. Reinforcement for Dock levelers verified per S2.1 Detail 6. Okay for concrete placement at progress areas. | |
| 11/07/2025 | COT - HCBU - Preslab | Partial Pass |