Inspection Status: Partial Pass

Inspection History: COT - HCBU - Framing

Permit Number - TC-COM-0624-01147

Inspection Description - COT - HCBU - Framing

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/19/2025 COT - HCBU - Framing Partial Pass 8-19-25: precon meeting for possible RFI on rooftop metal framing construction located on west side of building.
08/26/2025 COT - HCBU - Framing Partial Pass Roof framing at GL: 4.1 - 9.5/A -G.5. OK to,cover progress area with plywood for,roofing.
08/29/2025 COT - HCBU - Framing Partial Pass 8-29-25: okay to add roof/wall plywood at Gridline AA/2.9-4.1 & AA- A/5-6.
09/02/2025 COT - HCBU - Framing Partial Pass 9-2-25: Metal framing at Gridline F/8-9.5 approved-okay to continue with construction. Furr out at Gridline AA-A 1-2/2.9-4 also verified per plans -okay for plywood.Metal framing at Gridline's AA/1-2, 5-6, 7-9.5, A-F/9.5-8 verified per plans. Okay to install plywood sheathing at progress areas.
09/05/2025 COT - HCBU - Framing Partial Pass 9-5-25: framing at Gridline F/6-7.5 (windows at Area D) verified per detail. At both electrical rooms (area A & B) along the south walls-Add clips/screws at each stud and secure up to midway point of walls. Styrofoam scoreboard insulation verified in place at each room.
09/11/2025 COT - HCBU - Framing Partial Pass 9-11-25: wall fur out at Gridline 9.5/D- north of E approved. Okay to continue construction at progress areas.
09/22/2025 COT - HCBU - Framing Partial Pass 9-22-25: verified clips up to the halfway point of exterior wall on metal framing at room's 131, 133, 150, & 151. 2x4 fur out also inspected & approved along north side of loading docks and at the northeast corner of the building at Gridline 0.1 to east/ between E- G. Okay to continue with construction at progress areas.
10/07/2025 COT - HCBU - Framing Partial Pass Roof framing at boat sales area and electric room. Ok to cover progress areas.
10/16/2025 COT - HCBU - Framing Partial Pass 10-16-25: metal framing for towers at Gridline 1.5/East to North of G-E & 0.1 to East/A-B approved. Okay to install plywood sheathing at progress areas.
10/23/2025 COT - HCBU - Framing Partial Pass 10-23-25: interior metal framing at Gridline A-B/1-9 approved. Okay to continue with construction at progress areas. electrical room 109 & framing at tower between Gridline A/5-6 approved.
10/24/2025 COT - HCBU - Framing Partial Pass 10-24-25: framing for tower at Gridline G to north/ 1 to 0.1 approved. Okay to install sheathing at progress areas.
10/28/2025 COT - HCBU - Framing Partial Pass 10-28-25: framing for tower at Gridline 5 to 4.1/G-H approved. Okay to continue construction at progress areas.
10/29/2025 COT - HCBU - Framing Partial Pass 10-29-25: framing at room's 108 & 109 approved. Okay to continue with construction at progress areas.
11/05/2025 COT - HCBU - Framing Partial Pass 11-5-25: framing at Gridline Between G & H/2.9 to East approved-Okay to install plywood
11/06/2025 COT - HCBU - Framing Partial Pass 11/6/25: Electrical in wall approved at exterior walls at Area B (GL A/1 - D/1), Area A (GL E.5/1 - H/1-3), Area D (GL G/6 - F/8)
11/12/2025 COT - HCBU - Framing Partial Pass Central clearance area high walls at East and West walls from mural area to main,entry area. Ok to insulate and sheet rock progress areas.
11/24/2025 COT - HCBU - Framing Partial Pass 11/24/2025 Framing areas A, C and D. Partially approved. Pending kickers at interior walls. All other areas can proceed with construction.
COT - HCBU - Framing Scheduled