Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
Permit Number - TC-COM-0624-01147
Inspection Description - COT - HCPL - Rough Soil
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | COT - HCPL - Rough Soil | Partial Pass | 5/12/25: plumbing underground per approved plans at GL (B/3-5, A-D/5, D/5-10,C-D/9), ok to backfill progress areas. Shading required. | |
| COT - HCPL - Rough Soil | Partial Pass | 5/12/25: plumbing underground per approved plans at GL (B/3-5, A-D/5, D/5-10,C-D/9), ok to backfill progress areas. Shading required. 5/19/25: Plumbing underground per plans and under test at boat service room 110. |
||
| 05/21/2025 | COT - HCPL - Rough Soil | Partial Pass | Restroom waste and vent lines at 1 1/2” - 3” with 3” laterals to main waste lines. Ok to cover progress areas. | |
| 05/29/2025 | COT - HCPL - Rough Soil | Partial Pass | 5/29/2025 Restrooms 104 and 105 janitors closet 108 restroom hall 103 on the water plan detail 3 on page P1.2. Approved okay to backfill progress areas. Shading is required. 8” roof drain on Grid line E column 9. 8” roof drain on Grid line B column 9. Okay to proceed progress areas. Shading is required for backfill. Partial pass. Main water line 3” riser in place at Grid line A column 5. |
|
| 08/28/2025 | COT - HCPL - Rough Soil | Partial Pass | Aquarium waste line at 4” on GL: 2.1/E.2. Ok to cover progress area. |