Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2025 | BULD - Electrical Clearance | Passed | Approved building 1 - DGC Clearance to TEP is required for the solar meter (#157685780) | |
| 12/23/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap - DGL Clearance was called into TEP for Building #1 Pending solar |