Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Building Progress
Permit Number - TC-COM-0623-01583
Inspection Description - COT - LCBU - Building Progress
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/02/2024 | COT - LCBU - Building Progress | Partial Pass | Partial for the 1st lift of the restraining wall, okay to grout and concrete fill to lower bond beam | |
01/09/2024 | COT - LCBU - Building Progress | Partial Pass | Partial for the 1st lift of the restraining wall, okay to grout and concrete fill cavity up to lower bond beam | |
01/19/2024 | COT - LCBU - Building Progress | Partial Pass | Partial pass. Okay to grout and top out at restraining wall. Also fill cavity between wall and existing structure. 1/19/2024 | |
01/24/2024 | COT - LCBU - Building Progress | Re-inspection required | 1/24/24: no access no answer from contractor | |
02/09/2024 | COT - LCBU - Building Progress | Partial Pass | 2/9/2024 partial pass three footings at garden area to attach to the new masonry walls to support existing walls. (Lower level walls inside garden) | |
02/28/2024 | COT - LCBU - Building Progress | Passed | Arch re enforcement at rabbit hole area. Rebar and steel lintel per plan. Okay for concrete placement. 2/28/2024 |