Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2025 | ENGR Engineering Final | Partial Pass | Field Lighting is all in. Planting Irrigation and DG are installed and correct. Outfield Fence is a change order under same permit. When outfield fence is complete and whole scope is finished please call us out to finish inspection. |
|
| 08/01/2025 | ENGR Engineering Final | Not Ready | 6ft fence across back of field is complete. Sidewalk along south of project was not complete. Sidewalk along San Francisco does not connect to curb ramp at Craycroft as indicated. Dugouts have not been removed and replaced. Foul ball posts are missing. Bullpen is missing. 20' backstop was not replaced. Drinking fountain doesn't work. These items will need to be completed or an approved revision is necessary. | |
| 09/25/2025 | ENGR Engineering Final | Partial Pass | Outfield fencing and lights are complete. Dugouts are falling apart and walking path on South side is missing. Site is not complete. |