Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Progress 

Permit Number - TC-COM-0623-01485

Inspection Description - COT - HCPL - Plumbing Progress 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/26/2024 COT - HCPL - Plumbing Progress  Partial Pass Not ready. Correct S TRAP at floor drain. Re pressurize system. 11/13/2023
11/15/23: corrections made ok to backfill underground plumbing in bldg G.
12/21/23 plumbing under slab ok to backfill, from floor drains to main sewer tap outside roof up door on loading dock
1/26/24: DWV from mechanical room 10 to mens and women's restroom per plan and under Test. Ok to proceed. Hot and cold water lines per plan and under pressure at 100psi. Cold water tied into main. Hot water connections tapped off and will be connected to water heater.
03/18/2024 COT - HCPL - Plumbing Progress  Partial Pass Not ready. Correct S TRAP at floor drain. Re pressurize system. 11/13/2023
11/15/23: corrections made ok to backfill underground plumbing in bldg G.
12/21/23 plumbing under slab ok to backfill, from floor drains to main sewer tap outside roof up door on loading dock
1/26/24: DWV from mechanical room 10 to mens and women's restroom per plan and under Test. Ok to proceed. Hot and cold water lines per plan and under pressure at 100psi. Cold water tied into main. Hot water connections tapped off and will be connected to water heater.
3/18/24: plumbing above ceiling approved in rooms 103,102,101,110,108,105,106,109,108 ok to proceed.
05/15/2024 COT - HCPL - Plumbing Progress  Partial Pass Not ready. Correct S TRAP at floor drain. Re pressurize system. 11/13/2023
11/15/23: corrections made ok to backfill underground plumbing in bldg G.
12/21/23 plumbing under slab ok to backfill, from floor drains to main sewer tap outside roof up door on loading dock
1/26/24: DWV from mechanical room 10 to mens and women's restroom per plan and under Test. Ok to proceed. Hot and cold water lines per plan and under pressure at 100psi. Cold water tied into main. Hot water connections tapped off and will be connected to water heater.
3/18/24: plumbing above ceiling approved in rooms 103,102,101,110,108,105,106,109,108 ok to proceed.
5/15/24: underground plumbing at east half of building per plans ok to proceed.
07/10/2024 COT - HCPL - Plumbing Progress  Passed
11/13/2023 COT - HCPL - Plumbing Progress  Re-inspection required Not ready. Correct S TRAP at floor drain. Re pressurize system. 11/13/2023
11/15/2023 COT - HCPL - Plumbing Progress  Partial Pass Not ready. Correct S TRAP at floor drain. Re pressurize system. 11/13/2023
11/15/23: corrections made ok to backfill underground plumbing in bldg G.
12/21/2023 COT - HCPL - Plumbing Progress  Partial Pass 12/21/23 plumbing under slab ok to backfill, from floor drains to main sewer tap outside roof up door on loading dock