Inspection Status: Partial Pass
Inspection History: COT - LCBU - Masonry Pregrout
| Date |
Description |
Inspector |
Results |
Comments |
| 07/16/2026 |
COT - LCBU - Masonry Pregrout |
|
Partial Pass |
7-16-26: verified 2-4 1/2" drilled embedments for a/c window enclosure together with 2 additional door (16 drilled 4 1/2" embedments) cmu enclosures each using #5 rebar. 3rd. party to witness epoxy-submit report to the city for review. Okay to proceed with construction of reinforcement at wall & a/c enclosure. Will verify cmu wall enclosure at 4' lift. |
| 07/17/2026 |
COT - LCBU - Masonry Pregrout |
|
Partial Pass |
7-17-26: reinforcement at both door/ wall cmu enclosures verified per plans. Okay to grout 1st lift at 4'. |
| 07/20/2026 |
COT - LCBU - Masonry Pregrout |
|
Partial Pass |
7-20-26: okay to grout top out. |