| 09/24/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 9/24/26: Section by grid line A and 10 All grids line A All follow the 121 detail Grid line A on the West side Detail 123 Grid line 1 A-D Detail 102 Rebar conditions 110A 110B 109 110B 109 110A |
|
| 10/08/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 10.8.26 J/h line 9 requires RFI submittal for approval of configuration Inspected all 12 Interior footers meet listed detail requirements but must be cleaned of debris and obstructions Exterior footings inspected D10 to d6 (southeastcorner ) Ok for concrete placement at progress areas |
|
| 10/08/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | approved | |
| 10/14/2026 | COT - RSBU - Excavation/Rebar/Zoning | Canceled | 10/14/26: canceled by contractor. Notes for CMU noted on masonry pre grout inspection. | |
| 10/20/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 10/20/26: 2nd lift verified per 3rd party-submit report as an attachment to the city for review & approval. 2nd lift at 8'? | |
| 10/27/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | ||
| 10/29/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 10/29/26 Pre-grout south wall and, Grid line J10-L. |
|
| 11/03/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 11.3.26 1. Next lift south wall, partial east, and west wall 2. Light pole cages |
|
| 11/04/2026 | COT - RSBU - Excavation/Rebar/Zoning | Not Ready | 11.4.26 2x F4 footers west side of building, pending top reinforcements and J bolts authorized per shop plan. |
|
| 11/05/2026 | COT - RSBU - Excavation/Rebar/Zoning | Partial Pass | 11/5/26: reinforcement at CMU walls for building verified per plans. Okay to grout 7 lift at 28' for South, North, East & West walls. |