Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2026 | COT - LCEL - Electrical Underground | Partial Pass | X5 1 " for future light poles. X1 3" for future EV charger. Approximately 40' west of electrical room. X7 2" from electrical room to new SES location. Continuos 3" all the way from SES to future transformer. All schedule 40 out of slab at 36" to top of pipes. Okay to backfill all progress areas. Shading required. Ensure caution tape is in place after 1st lift of compaction to lines out of slab. 10/7/2026 | |
| 10/15/2026 | COT - LCEL - Electrical Underground | Partial Pass | 10/15/26: 25-1" schedule 40 electrical branch circuits at elevated cardio platform areas. Okay to backfill approximately 130' of open trench using shading materials. | |
| 10/19/2026 | COT - LCEL - Electrical Underground | Partial Pass | 10/19/26 partial pass from rise into building | |
| 10/20/2026 | COT - LCEL - Electrical Underground | Partial Pass | 10/20/26: verified 2-4" schedule 40 communication conduits at G/L: G/8-okay to backfill approximately 40' of open trench at own risk. Submit electrical underground site plan to the city for review & approval prior to any future inspections. | |
| 10/27/2026 | COT - LCEL - Electrical Underground | Partial Pass | 10/27/26 1. conduits running ( four 1")from electrical room to kids section; and from electrical room running north about 70ft. |
|
| 10/29/2026 | COT - LCEL - Electrical Underground | Partial Pass | 10/29/26 Light pole conduits on the north side 4 poles 1 inch. |
|
| 10/30/2026 | COT - LCEL - Electrical Underground | Partial Pass | 10/30/26 Light pole conduits middle section |
|
| 11/03/2026 | COT - LCEL - Electrical Underground | Partial Pass | 11.3.26 1. Light pole cages and conduit for south side, and north to south trench west of building. |
|
| 11/05/2026 | COT - LCEL - Electrical Underground | Partial Pass | 11/5/26: verified trench depth on 1 1/4" primary Schedule 40 conduit for future EV charger running from West to East towards Southwest of building, 1-1" Schedule 40 conduit stemming from the Southwest area of building towards an Western direction for EV charger and a 1-3" Schedule 40 Conduit from Southwestern area of building towards West for Transformer. Okay to backfill approximately 140' of trench using shading materials. | |
| COT - LCEL - Electrical Underground | Scheduled |