Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/26/2025 |
COT - LCPL - Plumbing Final |
|
Not Ready |
|
| 10/13/2025 |
COT - LCPL - Plumbing Final |
|
Re-inspection required |
10-13-25: install water closet and backfill underneath DWV with concrete. Add enough concrete to cover any exposed dirt underneath tub at access point in closet. |
| 10/14/2025 |
COT - LCPL - Plumbing Final |
|
Re-inspection required |
10/14/2025 water closet has to be 15" to the center line from tub. With a clearance of 21" in front. Add concrete at tub to exposed dirt. |
| 10/23/2025 |
COT - LCPL - Plumbing Final |
|
Passed |
|