Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2026 | ENGR Engineering Final | Partial Pass | Okay for level 2 TCO. Keep other entrances accessible while installing bollards in front of store. |
|
| 04/30/2026 | ENGR Engineering Final | Partial Pass | Ok for Level 4 TCO. Use temporary fencing to protect public from site work while building refuse enclosure and finishing curb ramps and fence equipment materials. Maintain access around building for emergency services. Maintain Handicap parking striping and Access Aisles and crosswalks as much as possible while seal coating. | |
| 05/29/2026 | ENGR Engineering Final | Passed | ||
| ENGR Engineering Final | Not Ready | Site work needs a Development Plan to be Reviewed and Permitted. There is a Refuse enclosure at rear building on building plans, currently no vertical separation between parking Lot and sidewalk in front of the store. Construction of new curb ramps For new entrances of building etc are planned. | ||
| ENGR Engineering Final | Not Ready | 12/9/25 DP has not been submitted or accepted yet. Work on the site should not be done until you have DP permit. |