Permit: TC-COM-0524-01012

Parcel: 129141460


Addresses:

2920 S PARK AV

Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
06/04/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Partial pass. Detail 104. Page S4.0. Basement wall and footing reinforcements and depth per plan. Okay for concrete placement. 6/4/2025
06/16/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Partial pass. Reinforcements per plan per Detail 104 on page S4.0 approved. Pending forms to be set on the exterior side of wall. 6/16/2025
06/18/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Partial pass. Detail 104. Page S4.0. Basement wall and footing reinforcements and depth per plan. Okay for concrete placement. 6/4/2025

Partial pass. Reinforcements per plan per Detail 104 on page S4.0 approved. Pending forms to be set on the exterior side of wall. 6/16/2025
6/18/25: forms set in place and reinforcement per plan at exterior wall per detail S4.0/104
06/26/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Lower level slab with rebar reinforcement in place. Ok to place concrete in progress areas.
08/01/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 8-1-25: reinforcement at decking & exterior wall footings verified per details on page S4.0. Okay for placement of concrete at progress areas.
11/18/2025 COT - LCBU - Excavation/Rebar/Zoning  Passed