Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | COT - HCEL - Electrical Progress | Partial Pass | Electric underground: South basement area: six 1” conduits for use in the bar area. Ok to cover progress area. | |
| 09/22/2026 | COT - HCEL - Electrical Progress | Partial Pass | 9/22/2026 Partial pass. Basement electrical in wall approved at restroom 07, utility room 13, restroom 04,05,&06. Ground level bar location 107, kitchen 107. Level 2 restroom 208&209. Bar 205. Approved. Note: mezzanine location M109 electrical disconnect equipment cannot be below drainage pipes. Per E3405.1 note (a) or E3405.3. |
|
| 11/13/2025 | COT - HCEL - Electrical Progress | Partial Pass | 11/13/25: Electrical underground approved from existing transformer to new CT Cabinet, electrical underground approved from ejector pump control panel location to sump for pump power (revision required for changes made (1)2" and (1) 3/4" |