Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2024 | COT - LCBU - Framing | Partial Pass | wood framing. | |
| 09/05/2024 | COT - LCBU - Framing | Partial Pass | Theater walls. | |
| 09/24/2024 | COT - LCBU - Framing | Partial Pass | Fire wall. | |
| 09/26/2024 | COT - LCBU - Framing | Partial Pass | Southwest firewalls. Also second layer on Southeast firewalls. | |
| 10/01/2024 | COT - LCBU - Framing | Partial Pass | Three-by plate attachments at Southeast wall. | |
| 10/02/2024 | COT - LCBU - Framing | Not Ready | ||
| 10/04/2024 | COT - LCBU - Framing | Partial Pass | East side bearing walls at firewalls. | |
| 10/08/2024 | COT - LCBU - Framing | Partial Pass | South Barge wall. | |
| 10/14/2024 | COT - LCBU - Framing | Partial Pass | West Firewall, Bowling, Arcade, and Redemption Center. East side bearing walls at firewalls. |
|
| 11/13/2024 | COT - LCBU - Framing | Passed |