Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - HCBU - Building Final | Re-inspection required | 9/7/23: flush valve required on door side, coat hooks required at 48" max off floor, urinal required to be max 17" off floor, Fire Dept required to sign off. | ||
| 09/08/2023 | COT - HCBU - Building Final | Partial Pass | 9/7/23: flush valve required on door side, coat hooks required at 48" max off floor, urinal required to be max 17" off floor, Fire Dept required to sign off. 9/8/23: ADA compliant urinal is not operable. Repair and lower to min 17" off floor by 9/11/23. Per TFD, maintain a full time fire watch until sprinkler system is approved. |
|
| 09/11/2023 | COT - HCBU - Building Final | Not Ready | 9/7/23: flush valve required on door side, coat hooks required at 48" max off floor, urinal required to be max 17" off floor, Fire Dept required to sign off. 9/8/23: ADA compliant urinal is not operable. Repair and lower to min 17" off floor by 9/11/23. Per TFD, maintain a full time fire watch until sprinkler system is approved. 9/11/23: waiting on Fire Dept final. |
|
| 10/02/2023 | COT - HCBU - Building Final | Passed |