Inspection Status: Not Ready

Inspection History: COT - HCBU - Building Final 

Date Description Inspector Results Comments
11/09/2023 COT - HCBU - Building Final  Not Ready
11/17/2023 COT - HCBU - Building Final  Partial Pass 11/17/23 one unit needs a condensate line, sun shield the low side on freezer condenser, placards for restrooms, occupancy load sign, GFI,S above steam table
11/22/2023 COT - HCBU - Building Final  Passed Gas and Electric already connected.