Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2024 | COT - HCPL - Plumbing Final | Not Ready | 7/9/2024 called left a voicemail. Did not receive a call back. Got to the site no one was there. Need access to site. | |
| 07/10/2024 | COT - HCPL - Plumbing Final | Re-inspection required | 7/9/2024 called left a voicemail. Did not receive a call back. Got to the site no one was there. Need access to site. 7/10/24: ADA requirements not met at bathrooms, Clean out missing at condensation line at HVAC, All plastic piping on exterior of building must be UV coated, Fire final not passed, Engineering not passed, air balance report required, water sterilization required, Service receptacle at roof needs to be WR. |
|
| 07/17/2024 | COT - HCPL - Plumbing Final | Passed |