Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2024 | COT - HCME - Mechanical Final | Not Ready | 7/9/2024 called left a voicemail. Did not receive a call back. Got to the site no one was there. Need access to site. | |
| 07/10/2024 | COT - HCME - Mechanical Final | Re-inspection required | 7/9/2024 called left a voicemail. Did not receive a call back. Got to the site no one was there. Need access to site. 7/10/24: ADA requirements not met at bathrooms, Clean out missing at condensation line at HVAC, All plastic piping on exterior of building must be UV coated, Fire final not passed, Engineering not passed, air balance report required, water sterilization required, Service receptacle at roof needs to be WR. |
|
| 07/17/2024 | COT - HCME - Mechanical Final | Passed |