Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0523-01205

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
11/01/2023 ENGR Engineering Final Partial Pass ATM has been installed and operating.
Drop box will not be installed until the 14th or 15th at which time super will call for his final.
11/07/2023 ENGR Engineering Final Partial Pass TC of O level 4 (ATM) is not to be used until shade structure and Bollards are completed and recall of Engineering Final inspection is approved.
12/04/2023 ENGR Engineering Final Passed