Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2024 | BULD - Electrical Clearance | Passed | Not required for this project. Electrical was never turned off to building. Only work was to the front lobby area. All registers are fully operational. |