Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Grounding/Bonding
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2023 | COT - LCEL - Grounding/Bonding | Partial Pass | Canopy A. 1 in dirt at a depth of 9'4. 5 in asphalt at a depth of 7'11. Canopy B. 4 in asphalt at a depth of 7'11. Total of 10 footings all per plans along with the rebar. Okay for concrete placement. 6/28/2023 |
|
| 06/30/2023 | COT - LCEL - Grounding/Bonding | Partial Pass | ||
| 08/11/2023 | COT - LCEL - Grounding/Bonding | Passed |