Inspection Status: Partial Pass
Inspection History: PDSD Building Division SIte Consultation
| Date |
Description |
Inspector |
Results |
Comments |
| 06/11/2026 |
PDSD Building Division SIte Consultation |
|
Partial Pass |
Okay to pour sidewalks and ramp. ensure that sidewalks do not exceed 2% in any direction and that ramp does not exceed 2% cross slope or 8.3% running slope. |
| 06/15/2026 |
PDSD Building Division SIte Consultation |
|
Passed |
Ramp and sidewalk are compliant |