Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0426-00478

Parcel: 135022990

Inspection Status: Not Ready

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
07/10/2026 COT - LCBU - Building Final  Not Ready
07/21/2026 COT - LCBU - Building Final  Re-inspection required Main bathroom does not meet ada requirements yet.
Safety protection needed under sing plumbing
Flush must be on outside facing side of toilet
Confirm with architect/ada code for bathtub height and access in main bathroom
Max Occupancy load sign required
Contact fire about remaining fire inspections both past and future
07/24/2026 COT - LCBU - Building Final  Passed 7/24/26: all corrections made, pending fire finals