Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 136406740


Addresses:

9590 E 22ND ST


Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0425-00860

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
11/21/2025 ENGR Engineering Final Partial Pass 11/21/25
Trash Compactor in Loading dock has been drained of hydraulic fluid, disconnected from power and is rendered safe as possible. No notes on it in demo on plan. Plan for removal in discussion.
Grates in loading dock drain will need to be replaced. Exposed bolts, sharp angle iron etc to be need to be removed in loading dock. Connex box and Port a John to be removed and other items before ENGR Final can be passed.
Ok for Level 1 TCO. Request Inspection again when ready.
11/26/2025 ENGR Engineering Final Partial Pass Okay for level 4 TCO
12/15/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.