Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-0425-00860
Inspection Description - ENGR Engineering Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/21/2025 | ENGR Engineering Final | Partial Pass | 11/21/25 Trash Compactor in Loading dock has been drained of hydraulic fluid, disconnected from power and is rendered safe as possible. No notes on it in demo on plan. Plan for removal in discussion. Grates in loading dock drain will need to be replaced. Exposed bolts, sharp angle iron etc to be need to be removed in loading dock. Connex box and Port a John to be removed and other items before ENGR Final can be passed. Ok for Level 1 TCO. Request Inspection again when ready. |
|
| 11/26/2025 | ENGR Engineering Final | Partial Pass | Okay for level 4 TCO | |
| 12/15/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |