Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap - DGL Clearance was called into TEP at 10:15am Pending solar |
|
| 08/18/2025 | BULD - Electrical Clearance | Re-inspection required | 8/18/25 Missing site placard at DC disconnect, and missing PV warning markings on EMT conduit. |
|
| 08/22/2025 | BULD - Electrical Clearance | Passed | TEP CLEARANCE: DGC |