Inspection Status: Partial Pass

Inspection History: COT - HCBU - Framing

Date Description Inspector Results Comments
01/05/2026 COT - HCBU - Framing Partial Pass 1-5-26: partial pass at office framing -add screws to angle bracket above glass and add angle brackets to each cell at top and bottom above glass windows.
01/14/2026 COT - HCBU - Framing Partial Pass 1-14-26: drywall screw inspection at interior side of offices approved. Okay to tape & texture progress areas.
02/18/2026 COT - HCBU - Framing Not Ready 2-18-26: not ready.
03/09/2026 COT - HCBU - Framing Passed 3-9-26: approved.
10/15/2025 COT - HCBU - Framing Partial Pass 10-15-25: framing for demising wall at Unit 2140 of Building 2 verified per details. Okay to One side and schedule a drywall nailing inspection prior to tape & texture.
10/24/2025 COT - HCBU - Framing Partial Pass Partial pass, pending interior walls on the east side of building.
11/19/2025 COT - HCBU - Framing Partial Pass 11/19/2025 partial pass. framing on office demising wall only