Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - LCEL - Electrical Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2025 |
COT - LCEL - Electrical Intermediate |
|
Re-inspection required |
10-16-25: all receptacles must be made up at time of inspection, relocate or move over existing receptacle located on north wall away from new door. Secure all AWG wires with a staple to stud within 12" coming out of a box and another staple 2'thereafter. Add a shot pin within 6" of a sill plate on each side and 24" o.c. thereafter. Add rubber/ plastic bushings to knockouts at junction box above ceiling & label junction box, fire foam all penetrations at top plates. Re-inspect required. |
| 10/20/2025 |
COT - LCEL - Electrical Intermediate |
|
Passed |
10-20-25: intermediates & drywall nailing approved-Okay for tape & texture. |