Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-0424-00728
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2024 | ENGR Engineering Final | Not Ready | on-site meeting to look at all the work that has to be done and assess the contractor and how his scheduling should be done for inspections. Also met with Ernie and Gustavo from the building department along with a contractor to discuss the emergency exit that is supposed to be located on the north west corner of the building and it’s compliancy. The health department has closed to existing door openings that are more suitable for an emergency exit than the one on the northside. Ernie Stevens will contact the Pima County health Department and try to find out what was the reasoning for closing the other two doors and why the northern exit should be utilized since it’s not compliant for any type of egress. | |
| 10/14/2024 | ENGR Engineering Final | Partial Pass | Contractor needs to move all the construction equipment on the sidewalk and on the side area. Also, there’s only 17 parking spaces per plan. There should be 18 parking spots. | |
| 10/15/2024 | ENGR Engineering Final | Passed |