Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - LCEL - Electrical Above Ceiling 

Permit Number - TC-COM-0424-00685

Inspection Description - COT - LCEL - Electrical Above Ceiling 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/09/2026 COT - LCEL - Electrical Above Ceiling  Partial Pass 1-9-26: mechanical & electrical above ceiling at coating room 1 & breezeway in Area C approved. Okay to install tiles & hard grid.
01/21/2026 COT - LCEL - Electrical Above Ceiling  Canceled 1-21-26: canceled by contractor.
01/26/2026 COT - LCEL - Electrical Above Ceiling  Re-inspection required 1-26-26: label all junction boxes above ceiling, hot copper water lines 3/4" or larger must be insulation with minimum of R3, add 10 mil tape to all locations where copper lines are in contact with seismic wires, provide supports to copper lines that are resting directly on top of ceiling grid (supports attached directly to the ceiling grid is not allowed). Reschedule inspection when corrections are made.
02/05/2026 COT - LCEL - Electrical Above Ceiling  Partial Pass 2-5-26: corrections made-okay to cover progress areas at ceiling.
02/25/2026 COT - LCEL - Electrical Above Ceiling  Passed 2-25-26: approved.
12/17/2025 COT - LCEL - Electrical Above Ceiling  Re-inspection required 12-17-25: remove unused/old conduit above ceiling at entry to shipping/receiving at north wall, label all junction boxes, add knockouts to junction boxes where needed, secure/install clamp to conduit located on south wall.
12/22/2025 COT - LCEL - Electrical Above Ceiling  Partial Pass 12-22-25: partial pass-okay to continue with construction at quality control & shipping/receiving areas.