Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Above Ceiling
Permit Number - TC-COM-0424-00685
Inspection Description - COT - LCEL - Electrical Above Ceiling
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | COT - LCEL - Electrical Above Ceiling | Partial Pass | 1-9-26: mechanical & electrical above ceiling at coating room 1 & breezeway in Area C approved. Okay to install tiles & hard grid. | |
| 01/21/2026 | COT - LCEL - Electrical Above Ceiling | Canceled | 1-21-26: canceled by contractor. | |
| 01/26/2026 | COT - LCEL - Electrical Above Ceiling | Re-inspection required | 1-26-26: label all junction boxes above ceiling, hot copper water lines 3/4" or larger must be insulation with minimum of R3, add 10 mil tape to all locations where copper lines are in contact with seismic wires, provide supports to copper lines that are resting directly on top of ceiling grid (supports attached directly to the ceiling grid is not allowed). Reschedule inspection when corrections are made. | |
| 02/05/2026 | COT - LCEL - Electrical Above Ceiling | Partial Pass | 2-5-26: corrections made-okay to cover progress areas at ceiling. | |
| 02/25/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 2-25-26: approved. | |
| 12/17/2025 | COT - LCEL - Electrical Above Ceiling | Re-inspection required | 12-17-25: remove unused/old conduit above ceiling at entry to shipping/receiving at north wall, label all junction boxes, add knockouts to junction boxes where needed, secure/install clamp to conduit located on south wall. | |
| 12/22/2025 | COT - LCEL - Electrical Above Ceiling | Partial Pass | 12-22-25: partial pass-okay to continue with construction at quality control & shipping/receiving areas. |