Inspection Status: Not Ready

Inspection History: COT - LCBU - Framing

Date Description Inspector Results Comments
05/29/2025 COT - LCBU - Framing Not Ready
09/17/2025 COT - LCBU - Framing Not Applicable 9-17-25: not applicable.
09/17/2025 COT - LCBU - Framing Partial Pass 9-17-25: add shot pins to metal wall base framing along Area B at 32" o.c. and shot pins within 6" at the ends of each plate. Will verify wall framing at pour back inspection.
09/19/2025 COT - LCBU - Framing Partial Pass 9-19-25: Area B framing verified per revised plans. Okay to continue with construction at progress areas
09/30/2025 COT - LCBU - Framing Partial Pass 9-30-25: drywall nailing for area b approved. Okay for tape & texture.
12/22/2025 COT - LCBU - Framing Passed 12-22-25: framing approved.