Inspection Status: Re-inspection required
Inspection History: COT - LCEL - Electrical Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 01/26/2026 |
COT - LCEL - Electrical Intermediate |
|
Re-inspection required |
1-26-26: label all junction boxes above ceiling, hot copper water lines 3/4" or larger must be insulation with minimum of R3, add 10 mil tape to all locations where copper lines are in contact with seismic wires, provide supports to copper lines that are resting directly on top of ceiling grid (supports attached directly to the ceiling grid is not allowed). Reschedule inspection when corrections are made. |
| 02/05/2026 |
COT - LCEL - Electrical Intermediate |
|
Partial Pass |
2-5-26: corrections made-okay to cover progress areas at ceiling. |
| 02/25/2026 |
COT - LCEL - Electrical Intermediate |
|
Passed |
2-25-26: approved. |
| 05/29/2025 |
COT - LCEL - Electrical Intermediate |
|
Not Ready |
|
| 09/17/2025 |
COT - LCEL - Electrical Intermediate |
|
Partial Pass |
9-17-25: in wall electrical verified per plans at Area B. Okay to continue with construction at progress areas. |