Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 02/16/2024 |
BULD - Electrical Clearance |
|
Passed |
Electrical service entrance and sub-panels are installed, with 4" conduit ran from gutter in ceiling to sub-panel location. Will issue a ECO Clearance for TEP to energize service entrance. |
| 03/27/2024 |
BULD - Electrical Clearance |
|
Not Ready |
Cancel by contractor |
| 04/02/2024 |
BULD - Electrical Clearance |
|
Not Ready |
|
| 04/05/2024 |
BULD - Electrical Clearance |
|
Passed |
|
| 04/05/2024 |
BULD - Electrical Clearance |
|
Passed |
|
| 12/08/2023 |
BULD - Electrical Clearance |
|
Passed |
Approved new service panel, ECO Clearance to TEP is required for the construction power |